按預定能力生産
综合能力考核表详细内容
按預定能力生産
Run @ Rate GP-9 按预定能力生产 I. PURPOSE 目的 The purpose of a Run @ Rate is to verify: Run @ Rate的目的是要核实: A. the supplier’s actual manufacturing process is capable of producing components that meet GM’s on-going quality requirements, as stated in the Production Part Approval Process (PPAP), at quoted tooling capacity for a specified period of time; and 供应商的当前制造过程是否有能力在指定的一段时间内按声称的加工能力、生 产出符合通用汽车公司现行质量要求的零部件。 如同在该零件“生产件批准” (PPAP) 文件中所述一 致。 B. the supplier’s actual manufacturing process conforms to the manufacturing and quality plan documented by the supplier in PPAP, GP-12 and other required documentation 供应商的当前生产流程是否符合供应商在PPAP,GP- 12或其它要求的文件中所记录的 制 造 和 质 量 计 划 。 During a Run @ Rate, all production tooling is to be in place and running at full capacity, utilizing all regular production, direct and indirect, personnel and support systems. 在Run @ Rate过程中,所有的生产工具应各就各位并且按最大能力运行,运用所有正 式 生产的 人 员 和支持系统,包括直接的和间接的。 SCOPE 适用范围 All new parts require a Run @ Rate, unless exempted by the supplier quality engineer and approved by the Supplier Quality and Purchasing Directors of the procuring division. 所有新的零部件都要通过Run @ Rate,除非供应商质量工程师认为可以免除并且得到 采 购 部 供 应 商质量和采购负责人的认可。 SELECTION PROCESS 规程选择 All new part numbers will be evaluated by GM, taking into consideration factors such as the following: history; new technology; irreversible tooling changes; and new supplier facilities. The need for the Run @ Rate will be confirmed by the Supplier Quality Engineer, and approved by the Supplier Quality and Purchasing Director(s) of the procuring division. The supplier will be notified of the need to perform a customer monitored or supplier monitored Run @ Rate as early in the Advanced Product Quality Planning Process as possible. Note: See Section VIII for Additional Requirements for Supplier monitored Run @ Rate. 所有新零件号中的零件都要经过通用汽车公司的评审,将考虑到如下的一些因素: 生产历史,新技术不能回复的模具更改,以及新的生产工厂等等。进行Run@Rate的 必要性由供应商质量工程师确认,并且得到采购部门的供应商质量及采购负责人的 认可。供应商将在前期产品质量计划(APQP)规程中尽早被通知是否要作一次用户监 督或由供应商自行监督的Run @ Rate。 注:见第VIII节中有关于由供应商自行监督下的Run @ Rate R的附加要求。 GENERAL INFORMATION 概述 A. DURATION OF RUN@RATE Run @ Rate的周期 The number of components to be produced during the Run @ Rate should be sufficient to demonstrate manufacturing process capability and should be predetermined by the supplier and the procuring division’s Supplier Quality Engineer(s). Factors such as product complexity, shelf life, storage, cost and single shift vs. multiple shift operations are taken into consideration in determining the length of the Run @ Rate. The default length of the Run @ Rate is one day of the customer’s daily production requirement at full acceleration. 在Run@Rate过程中所生产的零部件的数量要足以表明其所具备的生产能力,并 且由供应商和采购部门的质量工程师们共同预先商定。诸如产品复杂程度,有 效期,贮存,费用,单班运作或多班轮 作等等,都是影响Run@Rate时间长短应考虑的因素。Run@Rate的默认周期是用 户满负荷生产时一天的需求量。 TIMING OF RUN@RATE Run @ Rate的开始时间 The Run @ Rate should be performed after the supplier has attained an acceptable PPAP submission and prior to start of production acceleration. Although encouraged to be performed as early as possible, a key consideration in establishing the Run @ Rate date is the stability of the design. The exact date should be predetermined by the procuring division and the supplier. 供应商必须在获得PPAP生产件批准后及在开始加速生产之前进行Run@Rate。尽 管越早进行越好但是进行Run@Rate的关键考虑因素是该零件设计的确定性。确 切的日期应由采购部门和供应商共同确定。 B. REQUIRED PARTICIPATION 要求参加的人员 1. Customer Monitored - 用户监督 Customer - A representative from the procuring division is to be present for the entire Run @ Rate. No portion of the Run @ Rate is to be performed without representation of the procuring division, without prior approval. The lead GM representative typically will be the Supplier Quality Engineer, with participation of the Buyer and/or Release Engineer upon request. Supplier - The lead supplier representative is to be the project manager or manager appointee. 用户--采购部门的一个代表到现场监督整个生产过程。没有预先的许可, 没有代表到场,不得进行任何的操作,GM方面的首席代表是供应商质量工程 师。如有需要,采购员和产品放行工程师也可能被邀参加。 供应商--供应方的首席代表应是项目经理或是该项目经理指定的代表。 2. Supplier Monitored - 供应商 监 督 The lead supplier representative is to be the project manager or manager appointee. 供应方的首席代表应是项目经理或其指定的代表 Note: Equipment and/or subcontractors may be asked to participate. 注:设备制造商和分包商也可能被要求参加。 C. SUPPLIER PREPARTATION FOR RUN@RATE 供应商为Run @ Rate所作的准备 To make effective use of time, the supplier should conduct a practice Run @ Rate and/or production simulations, as well as complete as much of the Run @ Rate Worksheet (Attachment B), before the official Run @ Rate is conducted. 为了能有效地利用时间,在正式的Run@Rate进行之前,供应商应作一次演习或 相应的模拟生产,并完成工作表 (附录B) 上所规定的尽可能多的项目和所有问答。 D. INVENTORYE. 存货 If parts are produced ahead of production schedules, the supplier will hold all parts produced until authorized to ship. The supplier will ensure that sufficient production containers and packaging are available to prevent part damage. 如果零件的制造发生在总装厂需要之前,供应商应保存全部的零件直到允许装 运。供应商应保证有足够的生产用装运箱和合适的成品包装以防止零部件的损 坏。 IV. RUN@RATE REVIEW CONTENT Run @ Rate检查内容 The Run @ Rate will verify that the results of the supplier’s actual manufacturing process meet customer requirements for on-going quality, as stated in PPAP, and quoted tooling capacity. Also, it will verify that the supplier’s actual process is to plan, as documented in PPAP, GP-12 and the other documentation listed below. Run@Rate的目的是要核实供应商的实际制造过程是否符合现行质量要求(如在PPAP 文件中所说的)以及报价所称的工装能力,并且供应商实际生产过程是否按照已订 的计划,正如在PPAP、GP12及下列其它文件中所述的。 During the Run @ Rate, the following will be reviewed: documentation; the manufacturing process and results; part quality requirements and results; sub-supplier requirements and Run @ Rate results; and packaging. 在Run@Rate过程中,检查以下一些项目:文件,制造工艺和其结果,零件质量要求 和其结果,对分供方的要求及其Run @ Rate 的 结 果,还有包装和搬运。 A. DOCUMENTATION : At the time of the Run@Rate , the following support documentation should be available for review: 文件 : 在作 Run @ Rate审核时,应出具下列证明性文件以备查阅。 1. PPAP package including : PPAP 文件包括: a) Process flow diagram 过程流程 b) Process control plan, with reaction plan 具有反应计划的过程控制计划 c) DFMEA / PFMEA 设计/过程失效模式及后果分析 d) Master part(s) 标样 2. GP-12( Pre-launch ) control plan GP-12初期生产次品遏制的控制计划 3. Tool capacity information 工 装 能 力 情况 4. Operator/inspection instruction 操作 /检验指导书 5. Prototype / pilot concerns (PR/R’s) 样件/试生产时发生的问题(如PR/R) 6. Sub- contractor control / capacity data 分供方控制/能力数据 7. Sub-contractor material schedules and transportation 分供应商材料(含零件)生产计划及运输 8. Packaging / labeling plan 包装/ 标记计划 9. Acceleration plan 生产加速计划 Note : All documentation must be complete and correct 注: 所有文件都应完备及正确。 B. MANUFACTURING PROCESS – ACTUAL TO PLAN 制造过程– 实际相对于计划 1. The product is being manufactured at the production site using the production tooling, gaging, process, materials, operators, environment, and process settings. 产品应在生产现场用正式生产的工装、测量系统、工艺、材料、操作人员、 环境和过程设定来进行生产。 2. The actual process flow agrees with the process flow diagram, as documented in PPAP. 实际生产流程应与PPAP 文件中的流程图相同。 3. Operator instructions/visual aids are available and adhered to at each work station. 应将操作指导书/目视参考图表置于相应的每个工作岗位。 4. All in-process documents, such as process control charts, are in place at the time of the Run @ Rate. The documentation is utilized to drive a defined reaction plan and corrective action process. 在进行Run@Rate时,所有过程文件都应在工位上,如过程控制计划。这些文 件应用于实施规定的反应计划和纠正措施。 5. Production boundary samples, when required, are available at required work stations. 当需要时,在需要的工位上应拥有边际样品。 6. Maintenance plans are in place; repair and maintenance parts are available; and there is planned downtime for preventative maintenance. 应具备保养计划和用于维修和保养的备件以及进行预防性维修保养的停机计 划。 Note: All of the preceding requirements must be met to pass the Run @ Rate. 注:上述所有要求都须合格才能通过 Run @ Rate。 C. MANUFACTURING CAPACITY RESULTS 制造能力结果 The following will be verified while the process is running. 在进 行 生产时, 要核实以下内容: 1. Net output from each operation can support quoted capacity. 每 道 工 序的净产量与报价生产 能 力相符。 2. During the Run @ Rate, the tooling must meet the quoted up time requirements (net vs. gross quoted output). Any unexpected downtime must be documented and corrective action taken. 在按预定能 力生产时 ,工 装 应满 足报 价所 要求 的开机 时间要求(报 价净产量和标称毛产量)。 记下任何意外的停工时间和要求的改进措施计划。 3. All line changeovers, if any, can be performed within the quoted tooling capacity requirements. 所有在线工装的更换应在报价工装能力要求范围内进行。 4. The net through-put of good p...
按預定能力生産
Run @ Rate GP-9 按预定能力生产 I. PURPOSE 目的 The purpose of a Run @ Rate is to verify: Run @ Rate的目的是要核实: A. the supplier’s actual manufacturing process is capable of producing components that meet GM’s on-going quality requirements, as stated in the Production Part Approval Process (PPAP), at quoted tooling capacity for a specified period of time; and 供应商的当前制造过程是否有能力在指定的一段时间内按声称的加工能力、生 产出符合通用汽车公司现行质量要求的零部件。 如同在该零件“生产件批准” (PPAP) 文件中所述一 致。 B. the supplier’s actual manufacturing process conforms to the manufacturing and quality plan documented by the supplier in PPAP, GP-12 and other required documentation 供应商的当前生产流程是否符合供应商在PPAP,GP- 12或其它要求的文件中所记录的 制 造 和 质 量 计 划 。 During a Run @ Rate, all production tooling is to be in place and running at full capacity, utilizing all regular production, direct and indirect, personnel and support systems. 在Run @ Rate过程中,所有的生产工具应各就各位并且按最大能力运行,运用所有正 式 生产的 人 员 和支持系统,包括直接的和间接的。 SCOPE 适用范围 All new parts require a Run @ Rate, unless exempted by the supplier quality engineer and approved by the Supplier Quality and Purchasing Directors of the procuring division. 所有新的零部件都要通过Run @ Rate,除非供应商质量工程师认为可以免除并且得到 采 购 部 供 应 商质量和采购负责人的认可。 SELECTION PROCESS 规程选择 All new part numbers will be evaluated by GM, taking into consideration factors such as the following: history; new technology; irreversible tooling changes; and new supplier facilities. The need for the Run @ Rate will be confirmed by the Supplier Quality Engineer, and approved by the Supplier Quality and Purchasing Director(s) of the procuring division. The supplier will be notified of the need to perform a customer monitored or supplier monitored Run @ Rate as early in the Advanced Product Quality Planning Process as possible. Note: See Section VIII for Additional Requirements for Supplier monitored Run @ Rate. 所有新零件号中的零件都要经过通用汽车公司的评审,将考虑到如下的一些因素: 生产历史,新技术不能回复的模具更改,以及新的生产工厂等等。进行Run@Rate的 必要性由供应商质量工程师确认,并且得到采购部门的供应商质量及采购负责人的 认可。供应商将在前期产品质量计划(APQP)规程中尽早被通知是否要作一次用户监 督或由供应商自行监督的Run @ Rate。 注:见第VIII节中有关于由供应商自行监督下的Run @ Rate R的附加要求。 GENERAL INFORMATION 概述 A. DURATION OF RUN@RATE Run @ Rate的周期 The number of components to be produced during the Run @ Rate should be sufficient to demonstrate manufacturing process capability and should be predetermined by the supplier and the procuring division’s Supplier Quality Engineer(s). Factors such as product complexity, shelf life, storage, cost and single shift vs. multiple shift operations are taken into consideration in determining the length of the Run @ Rate. The default length of the Run @ Rate is one day of the customer’s daily production requirement at full acceleration. 在Run@Rate过程中所生产的零部件的数量要足以表明其所具备的生产能力,并 且由供应商和采购部门的质量工程师们共同预先商定。诸如产品复杂程度,有 效期,贮存,费用,单班运作或多班轮 作等等,都是影响Run@Rate时间长短应考虑的因素。Run@Rate的默认周期是用 户满负荷生产时一天的需求量。 TIMING OF RUN@RATE Run @ Rate的开始时间 The Run @ Rate should be performed after the supplier has attained an acceptable PPAP submission and prior to start of production acceleration. Although encouraged to be performed as early as possible, a key consideration in establishing the Run @ Rate date is the stability of the design. The exact date should be predetermined by the procuring division and the supplier. 供应商必须在获得PPAP生产件批准后及在开始加速生产之前进行Run@Rate。尽 管越早进行越好但是进行Run@Rate的关键考虑因素是该零件设计的确定性。确 切的日期应由采购部门和供应商共同确定。 B. REQUIRED PARTICIPATION 要求参加的人员 1. Customer Monitored - 用户监督 Customer - A representative from the procuring division is to be present for the entire Run @ Rate. No portion of the Run @ Rate is to be performed without representation of the procuring division, without prior approval. The lead GM representative typically will be the Supplier Quality Engineer, with participation of the Buyer and/or Release Engineer upon request. Supplier - The lead supplier representative is to be the project manager or manager appointee. 用户--采购部门的一个代表到现场监督整个生产过程。没有预先的许可, 没有代表到场,不得进行任何的操作,GM方面的首席代表是供应商质量工程 师。如有需要,采购员和产品放行工程师也可能被邀参加。 供应商--供应方的首席代表应是项目经理或是该项目经理指定的代表。 2. Supplier Monitored - 供应商 监 督 The lead supplier representative is to be the project manager or manager appointee. 供应方的首席代表应是项目经理或其指定的代表 Note: Equipment and/or subcontractors may be asked to participate. 注:设备制造商和分包商也可能被要求参加。 C. SUPPLIER PREPARTATION FOR RUN@RATE 供应商为Run @ Rate所作的准备 To make effective use of time, the supplier should conduct a practice Run @ Rate and/or production simulations, as well as complete as much of the Run @ Rate Worksheet (Attachment B), before the official Run @ Rate is conducted. 为了能有效地利用时间,在正式的Run@Rate进行之前,供应商应作一次演习或 相应的模拟生产,并完成工作表 (附录B) 上所规定的尽可能多的项目和所有问答。 D. INVENTORYE. 存货 If parts are produced ahead of production schedules, the supplier will hold all parts produced until authorized to ship. The supplier will ensure that sufficient production containers and packaging are available to prevent part damage. 如果零件的制造发生在总装厂需要之前,供应商应保存全部的零件直到允许装 运。供应商应保证有足够的生产用装运箱和合适的成品包装以防止零部件的损 坏。 IV. RUN@RATE REVIEW CONTENT Run @ Rate检查内容 The Run @ Rate will verify that the results of the supplier’s actual manufacturing process meet customer requirements for on-going quality, as stated in PPAP, and quoted tooling capacity. Also, it will verify that the supplier’s actual process is to plan, as documented in PPAP, GP-12 and the other documentation listed below. Run@Rate的目的是要核实供应商的实际制造过程是否符合现行质量要求(如在PPAP 文件中所说的)以及报价所称的工装能力,并且供应商实际生产过程是否按照已订 的计划,正如在PPAP、GP12及下列其它文件中所述的。 During the Run @ Rate, the following will be reviewed: documentation; the manufacturing process and results; part quality requirements and results; sub-supplier requirements and Run @ Rate results; and packaging. 在Run@Rate过程中,检查以下一些项目:文件,制造工艺和其结果,零件质量要求 和其结果,对分供方的要求及其Run @ Rate 的 结 果,还有包装和搬运。 A. DOCUMENTATION : At the time of the Run@Rate , the following support documentation should be available for review: 文件 : 在作 Run @ Rate审核时,应出具下列证明性文件以备查阅。 1. PPAP package including : PPAP 文件包括: a) Process flow diagram 过程流程 b) Process control plan, with reaction plan 具有反应计划的过程控制计划 c) DFMEA / PFMEA 设计/过程失效模式及后果分析 d) Master part(s) 标样 2. GP-12( Pre-launch ) control plan GP-12初期生产次品遏制的控制计划 3. Tool capacity information 工 装 能 力 情况 4. Operator/inspection instruction 操作 /检验指导书 5. Prototype / pilot concerns (PR/R’s) 样件/试生产时发生的问题(如PR/R) 6. Sub- contractor control / capacity data 分供方控制/能力数据 7. Sub-contractor material schedules and transportation 分供应商材料(含零件)生产计划及运输 8. Packaging / labeling plan 包装/ 标记计划 9. Acceleration plan 生产加速计划 Note : All documentation must be complete and correct 注: 所有文件都应完备及正确。 B. MANUFACTURING PROCESS – ACTUAL TO PLAN 制造过程– 实际相对于计划 1. The product is being manufactured at the production site using the production tooling, gaging, process, materials, operators, environment, and process settings. 产品应在生产现场用正式生产的工装、测量系统、工艺、材料、操作人员、 环境和过程设定来进行生产。 2. The actual process flow agrees with the process flow diagram, as documented in PPAP. 实际生产流程应与PPAP 文件中的流程图相同。 3. Operator instructions/visual aids are available and adhered to at each work station. 应将操作指导书/目视参考图表置于相应的每个工作岗位。 4. All in-process documents, such as process control charts, are in place at the time of the Run @ Rate. The documentation is utilized to drive a defined reaction plan and corrective action process. 在进行Run@Rate时,所有过程文件都应在工位上,如过程控制计划。这些文 件应用于实施规定的反应计划和纠正措施。 5. Production boundary samples, when required, are available at required work stations. 当需要时,在需要的工位上应拥有边际样品。 6. Maintenance plans are in place; repair and maintenance parts are available; and there is planned downtime for preventative maintenance. 应具备保养计划和用于维修和保养的备件以及进行预防性维修保养的停机计 划。 Note: All of the preceding requirements must be met to pass the Run @ Rate. 注:上述所有要求都须合格才能通过 Run @ Rate。 C. MANUFACTURING CAPACITY RESULTS 制造能力结果 The following will be verified while the process is running. 在进 行 生产时, 要核实以下内容: 1. Net output from each operation can support quoted capacity. 每 道 工 序的净产量与报价生产 能 力相符。 2. During the Run @ Rate, the tooling must meet the quoted up time requirements (net vs. gross quoted output). Any unexpected downtime must be documented and corrective action taken. 在按预定能 力生产时 ,工 装 应满 足报 价所 要求 的开机 时间要求(报 价净产量和标称毛产量)。 记下任何意外的停工时间和要求的改进措施计划。 3. All line changeovers, if any, can be performed within the quoted tooling capacity requirements. 所有在线工装的更换应在报价工装能力要求范围内进行。 4. The net through-put of good p...
按預定能力生産
[下载声明]
1.本站的所有资料均为资料作者提供和网友推荐收集整理而来,仅供学习和研究交流使用。如有侵犯到您版权的,请来电指出,本站将立即改正。电话:010-82593357。
2、访问管理资源网的用户必须明白,本站对提供下载的学习资料等不拥有任何权利,版权归该下载资源的合法拥有者所有。
3、本站保证站内提供的所有可下载资源都是按“原样”提供,本站未做过任何改动;但本网站不保证本站提供的下载资源的准确性、安全性和完整性;同时本网站也不承担用户因使用这些下载资源对自己和他人造成任何形式的损失或伤害。
4、未经本网站的明确许可,任何人不得大量链接本站下载资源;不得复制或仿造本网站。本网站对其自行开发的或和他人共同开发的所有内容、技术手段和服务拥有全部知识产权,任何人不得侵害或破坏,也不得擅自使用。
我要上传资料,请点我!
管理工具分类
ISO认证课程讲义管理表格合同大全法规条例营销资料方案报告说明标准管理战略商业计划书市场分析战略经营策划方案培训讲义企业上市采购物流电子商务质量管理企业名录生产管理金融知识电子书客户管理企业文化报告论文项目管理财务资料固定资产人力资源管理制度工作分析绩效考核资料面试招聘人才测评岗位管理职业规划KPI绩效指标劳资关系薪酬激励人力资源案例人事表格考勤管理人事制度薪资表格薪资制度招聘面试表格岗位分析员工管理薪酬管理绩效管理入职指引薪酬设计绩效管理绩效管理培训绩效管理方案平衡计分卡绩效评估绩效考核表格人力资源规划安全管理制度经营管理制度组织机构管理办公总务管理财务管理制度质量管理制度会计管理制度代理连锁制度销售管理制度仓库管理制度CI管理制度广告策划制度工程管理制度采购管理制度生产管理制度进出口制度考勤管理制度人事管理制度员工福利制度咨询诊断制度信息管理制度员工培训制度办公室制度人力资源管理企业培训绩效考核其它
精品推荐
下载排行
- 1社会保障基础知识(ppt) 16695
- 2安全生产事故案例分析(ppt 16695
- 3行政专员岗位职责 16695
- 4品管部岗位职责与任职要求 16695
- 5员工守则 16695
- 6软件验收报告 16695
- 7问卷调查表(范例) 16695
- 8工资发放明细表 16695
- 9文件签收单 16695
- 10跟我学礼仪 16695